| Issue Date | Title | Author(s) |
21 | 2021 | Distributed Fuzzy Permutation Flow Shop Scheduling Problem: A Bee Colony Algorithm | Baysal, M. Emin ; Sarucan, A. ; Büyüközkan, K.; Engin, O. |
22 | 2022 | Distributed No-Wait Flow Shop with Fuzzy Environment | Başar, Ramazan; Büyüközkan, K.; Engin, Orhan |
23 | 2020 | Estimation of Turkey’s Natural Gas Consumption by Machine Learning Techniques | Erdem, Osman Emin; Kesen, Saadettin Erhan |
24 | 2021 | Eşit bölümleme (EP) problemi yaklaşımı ile proje bazlı çalışma kapsamında görev ve bireylerin gruplandırılması | Erdeş, Hakan |
25 | 2023 | Evaluation of Mechanical Energy Storage Technologies in the Context of a Fuzzy Environment | Sarucan, A. ; Baysal, M.E.; Engin, O. |
26 | 2023 | An exact algorithm for Two-Echelon Location-Routing problem with simultaneous pickup and delivery | Yıldız, Ece Arzu; Karaoğlan, İsmail ; Altıparmak, Fulya |
27 | 2018 | Examination timetabling problem with scarce resources: a case study | Keskin, Muhammed Emre; Döyen, Alper ; Akyer, Hasan; Güler, Mehmet Güray |
28 | 2023 | Forecasting | Değirmencioğlu, Y. ; Akyurt, İ.Z. |
29 | 2018 | Forward supply Chain network design problem: Heuristic approaches | Koç, Çağrı; Özceylan, Eren; Kesen, Saadettin Erhan ; Çil, Zeynel Abidin; Mete, Süleyman |
30 | 2022 | Fuzzy Hybrid Flow Shop Scheduling Problem: An Application | İşler, M.; Engin, Orhan |
31 | 2022 | A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithm | Engin, Orhan ; Yılmaz, Mustafa Kerim |
32 | 2021 | GÜNEŞ ENERJİSİ KOLEKTÖRÜ ÜRETİMİNDE KAYNAK BAĞIMLI GÖREV SÜRELERİ İLE PARALEL MONTAJ HATTI DENGELEME | Atasagun, Yakup ; Kara, Yakup |
33 | 2022 | A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Project | Kökçam, Abdullah Hulusi; Engin, Orhan |
34 | 2021 | A hybrid genetic local and global search algorithm for solving no-wait flow shop problem with bi criteria | Keskin, K.; Engin, Orhan |
35 | 2019 | An Integrated Disaster Preparedness Model for Retrofitting and Relief Item Transportation | Döyen, Alper ; Aras, Necati |
36 | 2020 | An integrated hesitant fuzzy approach to a job evaluation and application in a food company | Sarucan, Ahmet ; Söğüt, A. |
37 | 2020 | Integrated production and outbound distribution activities with multiple vehicles | Yağmur, Ece; Kesen, Saadettin Erhan |
38 | 2020 | Integrated production and outbound distribution scheduling problem with due dates | Yağmur, Ece; Kesen, Saadettin Erhan |
39 | 2022 | Integrated Production and Transportation Scheduling Problem with Multiple Plants, Multiple Vehicles and Perishable Products | Can Atasagun, Gözde ; Karaoğlan, İsmail |
40 | 2019 | Integrated production scheduling and distribution planning with time windows | Kesen, Saadettin Erhan ; Bektaş, T. |