02.09. Department of Industrial Engineering

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Refined By:
Type:  Article

Results 1-20 of 52 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
12023An application on the use of fuzzy multi criteria decision making methods for software project development process selectionYel, İbrahim; Baysal, Mehmet Emin 
22022Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problemBaysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan 
32021Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem [2]Baysal, M.E.; Sarucan, A. ; Büyüközkan, K.; Engin, O.
42022Balancing disassembly line under hazardous parts with precise and fuzzy goalsHezer, Seda ; Kara, Yakup 
52022Beklemesiz Akış Tipi Çizelgeleme Problemlerinin Analizi ve Hibrit Dağınık Arama Yöntemi ile ÇözümüBaşar, Ramazan; Engin, Orhan 
62023Bi-objective coordinated production and transportation scheduling problem with sustainability: formulation and solution approachesYağmur, Ece; Kesen, Saadettin Erhan 
72021Comparative analysis of TOPSIS, VIKOR and COPRAS methods for the COVID-19 Regional Safety AssessmentHezer, Seda ; Gelmez, Emel; Özceylan, Eren
82022Dağıtık üretim içeren dağıtım şebekesi genişleme problemi için yeni bir matematiksel modelKaraoğlan, İsmail ; Yurtsever, Ayşenur; Dengiz, Berna; Erdener, Burçin Çakır
92020Estimation of Turkey’s Natural Gas Consumption by Machine Learning TechniquesErdem, Osman Emin; Kesen, Saadettin Erhan 
102023An exact algorithm for Two-Echelon Location-Routing problem with simultaneous pickup and deliveryYıldız, Ece Arzu; Karaoğlan, İsmail ; Altıparmak, Fulya
112018Examination timetabling problem with scarce resources: a case studyKeskin, Muhammed Emre; Döyen, Alper ; Akyer, Hasan; Güler, Mehmet Güray
122018Forward supply Chain network design problem: Heuristic approachesKoç, Çağrı; Özceylan, Eren; Kesen, Saadettin Erhan ; Çil, Zeynel Abidin; Mete, Süleyman
132022A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithmEngin, Orhan ; Yılmaz, Mustafa Kerim
142021GÜNEŞ ENERJİSİ KOLEKTÖRÜ ÜRETİMİNDE KAYNAK BAĞIMLI GÖREV SÜRELERİ İLE PARALEL MONTAJ HATTI DENGELEMEAtasagun, Yakup ; Kara, Yakup 
152022A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing ProjectKökçam, Abdullah Hulusi; Engin, Orhan 
162021A hybrid genetic local and global search algorithm for solving no-wait flow shop problem with bi criteriaKeskin, K.; Engin, Orhan 
172019An Integrated Disaster Preparedness Model for Retrofitting and Relief Item TransportationDöyen, Alper ; Aras, Necati
182024Integrated production scheduling and vehicle routing problem with energy efficient strategies: Mathematical formulation and metaheuristic algorithmsYağmur, Ece; Kesen, Saadettin Erhan 
192022INTERVAL TYPE-2 FUZZY RULE-BASED BWM APPROACH FOR SUSTAINABLE SUPPLIER SELECTIONÖztürk, Müslüm; Torğul, Belkız ; Paksoy, Turan
202022Investigating the effects of various control measures on economy and spread of COVID-19 in Turkey: a system dynamics approachAlim, Muzaffer; Kesen, Saadettin Erhan