| Issue Date | Title | Author(s) |
1 | 2023 | An application on the use of fuzzy multi criteria decision making methods for software project development process selection | Yel, İbrahim; Baysal, Mehmet Emin |
2 | 2022 | Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem | Baysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan |
3 | 2021 | Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem [2] | Baysal, M.E.; Sarucan, A. ; Büyüközkan, K.; Engin, O. |
4 | 2022 | Balancing disassembly line under hazardous parts with precise and fuzzy goals | Hezer, Seda ; Kara, Yakup |
5 | 2022 | Beklemesiz Akış Tipi Çizelgeleme Problemlerinin Analizi ve Hibrit Dağınık Arama Yöntemi ile Çözümü | Başar, Ramazan; Engin, Orhan |
6 | 2023 | Bi-objective coordinated production and transportation scheduling problem with sustainability: formulation and solution approaches | Yağmur, Ece; Kesen, Saadettin Erhan |
7 | 2021 | Comparative analysis of TOPSIS, VIKOR and COPRAS methods for the COVID-19 Regional Safety Assessment | Hezer, Seda ; Gelmez, Emel; Özceylan, Eren |
8 | 2022 | Dağıtık üretim içeren dağıtım şebekesi genişleme problemi için yeni bir matematiksel model | Karaoğlan, İsmail ; Yurtsever, Ayşenur; Dengiz, Berna; Erdener, Burçin Çakır |
9 | 2020 | Estimation of Turkey’s Natural Gas Consumption by Machine Learning Techniques | Erdem, Osman Emin; Kesen, Saadettin Erhan |
10 | 2023 | An exact algorithm for Two-Echelon Location-Routing problem with simultaneous pickup and delivery | Yıldız, Ece Arzu; Karaoğlan, İsmail ; Altıparmak, Fulya |
11 | 2018 | Examination timetabling problem with scarce resources: a case study | Keskin, Muhammed Emre; Döyen, Alper ; Akyer, Hasan; Güler, Mehmet Güray |
12 | 2018 | Forward supply Chain network design problem: Heuristic approaches | Koç, Çağrı; Özceylan, Eren; Kesen, Saadettin Erhan ; Çil, Zeynel Abidin; Mete, Süleyman |
13 | 2022 | A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithm | Engin, Orhan ; Yılmaz, Mustafa Kerim |
14 | 2021 | GÜNEŞ ENERJİSİ KOLEKTÖRÜ ÜRETİMİNDE KAYNAK BAĞIMLI GÖREV SÜRELERİ İLE PARALEL MONTAJ HATTI DENGELEME | Atasagun, Yakup ; Kara, Yakup |
15 | 2022 | A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Project | Kökçam, Abdullah Hulusi; Engin, Orhan |
16 | 2021 | A hybrid genetic local and global search algorithm for solving no-wait flow shop problem with bi criteria | Keskin, K.; Engin, Orhan |
17 | 2019 | An Integrated Disaster Preparedness Model for Retrofitting and Relief Item Transportation | Döyen, Alper ; Aras, Necati |
18 | 2024 | Integrated production scheduling and vehicle routing problem with energy efficient strategies: Mathematical formulation and metaheuristic algorithms | Yağmur, Ece; Kesen, Saadettin Erhan |
19 | 2022 | INTERVAL TYPE-2 FUZZY RULE-BASED BWM APPROACH FOR SUSTAINABLE SUPPLIER SELECTION | Öztürk, Müslüm; Torğul, Belkız ; Paksoy, Turan |
20 | 2022 | Investigating the effects of various control measures on economy and spread of COVID-19 in Turkey: a system dynamics approach | Alim, Muzaffer; Kesen, Saadettin Erhan |