02.09. Department of Industrial Engineering

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Refined By:
Fulltext:  No Fulltext

Results 1-20 of 35 (Search time: 0.003 seconds).

Issue DateTitleAuthor(s)
12019Achieving shojinka by integrated balancing of multiple straight lines with resource dependent task timesAtasagun, Y. ; Kara, Y.; Can Atasagun, Gözde 
22023An Application for Selecting and Evaluating Organization Based KPIs with Fuzzy MCDM in a Large-Scale Organization Operating in the IT SectorYel, İ.; Baysal, M.E.; Sarucan, A. 
32022An Application of Fuzzy AHP, EDAS and WASPAS for the Selection of Process Method in Software ProjectsYel, İ.; Sarucan, Ahmet ; Baysal, M.E.
42023An Application with Fuzzy AHP for Making the Assignment Aimed at the Holistic Benefit Over the Person Evaluation as Required by the Requirements and Evaluations of IndividualsYel, İ.; Şahin, H.; Baysal, M.E.; Sarucan, A. 
52022Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problemBaysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan 
62021Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem [2]Baysal, M.E.; Sarucan, A. ; Büyüközkan, K.; Engin, O.
72021Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with SustainabilityYağmur, Ece; Kesen, Saadettin Erhan 
82022Determination of Competencies with Fuzzy Multi-criteria Decision Making Methods for Determining the Development Program for Analyst Position in a Participation BankYel, İbrahim; Sarucan, Ahmet ; Baysal, Mehmet Emin 
92022Determination of the Best Alternative Position for the Storage Location/Product Assignment by Using VIKORSarıcan, Bünyamin; Baysal, Mehmet Emin ; Sarucan, A. 
102021Distributed Fuzzy Permutation Flow Shop Scheduling Problem: A Bee Colony AlgorithmBaysal, M. Emin ; Sarucan, A. ; Büyüközkan, K.; Engin, O.
112022Distributed No-Wait Flow Shop with Fuzzy EnvironmentBaşar, Ramazan; Büyüközkan, K.; Engin, Orhan 
122023Evaluation of Mechanical Energy Storage Technologies in the Context of a Fuzzy EnvironmentSarucan, A. ; Baysal, M.E.; Engin, O.
132018Examination timetabling problem with scarce resources: a case studyKeskin, Muhammed Emre; Döyen, Alper ; Akyer, Hasan; Güler, Mehmet Güray
142022Fuzzy Hybrid Flow Shop Scheduling Problem: An Applicationİşler, M.; Engin, Orhan 
152022A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithmEngin, Orhan ; Yılmaz, Mustafa Kerim
162022A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing ProjectKökçam, Abdullah Hulusi; Engin, Orhan 
172020An integrated hesitant fuzzy approach to a job evaluation and application in a food companySarucan, Ahmet ; Söğüt, A.
182020Integrated production and outbound distribution activities with multiple vehiclesYağmur, Ece; Kesen, Saadettin Erhan 
192020Integrated production and outbound distribution scheduling problem with due datesYağmur, Ece; Kesen, Saadettin Erhan 
202022Integrated Production and Transportation Scheduling Problem with Multiple Plants, Multiple Vehicles and Perishable ProductsCan Atasagun, Gözde ; Karaoğlan, İsmail