| Issue Date | Title | Author(s) |
1 | 2019 | Achieving shojinka by integrated balancing of multiple straight lines with resource dependent task times | Atasagun, Y. ; Kara, Y.; Can Atasagun, Gözde |
2 | 2023 | An Application for Selecting and Evaluating Organization Based KPIs with Fuzzy MCDM in a Large-Scale Organization Operating in the IT Sector | Yel, İ.; Baysal, M.E.; Sarucan, A. |
3 | 2022 | An Application of Fuzzy AHP, EDAS and WASPAS for the Selection of Process Method in Software Projects | Yel, İ.; Sarucan, Ahmet ; Baysal, M.E. |
4 | 2023 | An Application with Fuzzy AHP for Making the Assignment Aimed at the Holistic Benefit Over the Person Evaluation as Required by the Requirements and Evaluations of Individuals | Yel, İ.; Şahin, H.; Baysal, M.E.; Sarucan, A. |
5 | 2022 | Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem | Baysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan |
6 | 2021 | Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem [2] | Baysal, M.E.; Sarucan, A. ; Büyüközkan, K.; Engin, O. |
7 | 2021 | Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with Sustainability | Yağmur, Ece; Kesen, Saadettin Erhan |
8 | 2022 | Determination of Competencies with Fuzzy Multi-criteria Decision Making Methods for Determining the Development Program for Analyst Position in a Participation Bank | Yel, İbrahim; Sarucan, Ahmet ; Baysal, Mehmet Emin |
9 | 2022 | Determination of the Best Alternative Position for the Storage Location/Product Assignment by Using VIKOR | Sarıcan, Bünyamin; Baysal, Mehmet Emin ; Sarucan, A. |
10 | 2021 | Distributed Fuzzy Permutation Flow Shop Scheduling Problem: A Bee Colony Algorithm | Baysal, M. Emin ; Sarucan, A. ; Büyüközkan, K.; Engin, O. |
11 | 2022 | Distributed No-Wait Flow Shop with Fuzzy Environment | Başar, Ramazan; Büyüközkan, K.; Engin, Orhan |
12 | 2023 | Evaluation of Mechanical Energy Storage Technologies in the Context of a Fuzzy Environment | Sarucan, A. ; Baysal, M.E.; Engin, O. |
13 | 2018 | Examination timetabling problem with scarce resources: a case study | Keskin, Muhammed Emre; Döyen, Alper ; Akyer, Hasan; Güler, Mehmet Güray |
14 | 2022 | Fuzzy Hybrid Flow Shop Scheduling Problem: An Application | İşler, M.; Engin, Orhan |
15 | 2022 | A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithm | Engin, Orhan ; Yılmaz, Mustafa Kerim |
16 | 2022 | A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Project | Kökçam, Abdullah Hulusi; Engin, Orhan |
17 | 2020 | An integrated hesitant fuzzy approach to a job evaluation and application in a food company | Sarucan, Ahmet ; Söğüt, A. |
18 | 2020 | Integrated production and outbound distribution activities with multiple vehicles | Yağmur, Ece; Kesen, Saadettin Erhan |
19 | 2020 | Integrated production and outbound distribution scheduling problem with due dates | Yağmur, Ece; Kesen, Saadettin Erhan |
20 | 2022 | Integrated Production and Transportation Scheduling Problem with Multiple Plants, Multiple Vehicles and Perishable Products | Can Atasagun, Gözde ; Karaoğlan, İsmail |