02.09. Department of Industrial Engineering

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Refined By:
Date Issued:  [2020 TO 2024]

Results 1-20 of 74 (Search time: 0.004 seconds).

Issue DateTitleAuthor(s)
12022Afet öncesi zarar azaltma faaliyetlerinin insani yardım lojistiğindeki etkisinin en iyileme kullanılarak incelenmesiKula, Aslıhan Fatma 
22023An Application for Selecting and Evaluating Organization Based KPIs with Fuzzy MCDM in a Large-Scale Organization Operating in the IT SectorYel, İ.; Baysal, M.E.; Sarucan, A. 
32022An Application of Fuzzy AHP, EDAS and WASPAS for the Selection of Process Method in Software ProjectsYel, İ.; Sarucan, Ahmet ; Baysal, M.E.
42023An application on the use of fuzzy multi criteria decision making methods for software project development process selectionYel, İbrahim; Baysal, Mehmet Emin 
52023An Application with Fuzzy AHP for Making the Assignment Aimed at the Holistic Benefit Over the Person Evaluation as Required by the Requirements and Evaluations of IndividualsYel, İ.; Şahin, H.; Baysal, M.E.; Sarucan, A. 
62022Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problemBaysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan 
72021Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem [2]Baysal, M.E.; Sarucan, A. ; Büyüközkan, K.; Engin, O.
82022Balancing disassembly line under hazardous parts with precise and fuzzy goalsHezer, Seda ; Kara, Yakup 
92022Beklemesiz Akış Tipi Çizelgeleme Problemlerinin Analizi ve Hibrit Dağınık Arama Yöntemi ile ÇözümüBaşar, Ramazan; Engin, Orhan 
102023Bi-objective coordinated production and transportation scheduling problem with sustainability: formulation and solution approachesYağmur, Ece; Kesen, Saadettin Erhan 
112021Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with SustainabilityYağmur, Ece; Kesen, Saadettin Erhan 
122022Bulanık ortamda akıllı ve sürdürülebilir kriterlerle tedarikçi seçim süreci için strateji geliştirmeDemiralay, Enes 
132021Comparative analysis of TOPSIS, VIKOR and COPRAS methods for the COVID-19 Regional Safety AssessmentHezer, Seda ; Gelmez, Emel; Özceylan, Eren
142022Çok tesisli bütünleşik üretim ve dağıtım çizelgeleme problemleri için çözüm yöntemleriAtasagun, Gözde Can 
152022Dağıtık üretim içeren dağıtım şebekesi genişleme problemi için yeni bir matematiksel modelKaraoğlan, İsmail ; Yurtsever, Ayşenur; Dengiz, Berna; Erdener, Burçin Çakır
162023Design of Goods and ServicesDeğirmencioğlu, Y. ; Kara, Y.
172022Determination of Competencies with Fuzzy Multi-criteria Decision Making Methods for Determining the Development Program for Analyst Position in a Participation BankYel, İbrahim; Sarucan, Ahmet ; Baysal, Mehmet Emin 
182022Determination of the Best Alternative Position for the Storage Location/Product Assignment by Using VIKORSarıcan, Bünyamin; Baysal, Mehmet Emin ; Sarucan, A. 
192021Distributed Fuzzy Permutation Flow Shop Scheduling Problem: A Bee Colony AlgorithmBaysal, M. Emin ; Sarucan, A. ; Büyüközkan, K.; Engin, O.
202022Distributed No-Wait Flow Shop with Fuzzy EnvironmentBaşar, Ramazan; Büyüközkan, K.; Engin, Orhan