Engineering Geological Investigations of T-11 Tunnel Along Burdur-Antalya High-Speed Railway

No Thumbnail Available

Date

2020

Authors

Söğüt, Ali Rıza

Journal Title

Journal ISSN

Volume Title

Publisher

SPRINGER HEIDELBERG

Open Access Color

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Average
Influence
Average
Popularity
Average

Research Projects

Journal Issue

Abstract

Tunnels are underground structures constructed by cylindrical boring of the rock masses with certain proportions and methods. One of these methods is the new Austrian tunnelling method (NATM). The first and most important principle of this method is to preserve the strength of the rock mass and form a supporting circle in the surrounding rock mass around the tunnel. This method enables the construction of the tunnel to be both safe and economical. This paper aims to analyse geological and geotechnical properties of the 2045-m-span T-11 tunnel, which is planned to be constructed within the scope of Turkey Burdur-Antalya high-speed railway project. In this study, the data from borings LB (Lithology Borehole)-501, TB (Tunnel Borehole)-18, CB (Cut Borehole)-19 and discontinuity measurements were used. The laboratory results of these borings were also analysed. In total, five on-site discontinuity measurements were used in Dips v5.0 to generate the required data. The acquired data was used to analyse whether the limestone will be stable or unstable in the case of tunnel boring. The results of the analysis suggest that unstabilities are not expected. Evaluation of rock masses regarding the tunnel entrance was executed. In this study, the rock masses were evaluated with only rock mass rating (RMR) calculation. In order to compute RMR values, LB-501 boring data were used to calculate the uniaxial compressive strength and average point load strength. The limestone unit of Beydaglari Formation had an RMR value of 35 and was classified as a poor rock.

Description

4th International Conference on Computational and Experimental Science and Engineering (ICCESEN) -- OCT 04-08, 2017 -- Antalya, TURKEY

Keywords

Tunnelling methods, Burdur-Antalya railway project, New Austrian tunnelling method, Dips5

Turkish CoHE Thesis Center URL

Fields of Science

01 natural sciences, 0105 earth and related environmental sciences

Citation

WoS Q

Scopus Q

N/A
OpenCitations Logo
OpenCitations Citation Count
1

Source

ARABIAN JOURNAL OF GEOSCIENCES

Volume

13

Issue

16

Start Page

End Page

PlumX Metrics
Citations

CrossRef : 1

Scopus : 1

Captures

Mendeley Readers : 6

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.15293712

Sustainable Development Goals

4

QUALITY EDUCATION
QUALITY EDUCATION Logo

6

CLEAN WATER AND SANITATION
CLEAN WATER AND SANITATION Logo

7

AFFORDABLE AND CLEAN ENERGY
AFFORDABLE AND CLEAN ENERGY Logo

8

DECENT WORK AND ECONOMIC GROWTH
DECENT WORK AND ECONOMIC GROWTH Logo

9

INDUSTRY, INNOVATION AND INFRASTRUCTURE
INDUSTRY, INNOVATION AND INFRASTRUCTURE Logo

11

SUSTAINABLE CITIES AND COMMUNITIES
SUSTAINABLE CITIES AND COMMUNITIES Logo

12

RESPONSIBLE CONSUMPTION AND PRODUCTION
RESPONSIBLE CONSUMPTION AND PRODUCTION Logo

13

CLIMATE ACTION
CLIMATE ACTION Logo