Author
- 4
Engin, Orhan
- 2
Kesen, Saadettin Erhan
- 1
Baysal, Mehmet Emin
- 1
Başar, Ramazan
- 1
Bektaş, T.
- 1
Büyüközkan, K.
- 1
Büyüközkan, Kadir
- 1
Can Atasagun, Gözde
- 1
Güçlü, Abdullah
- 1
Karaoğlan, İsmail
- .
next >
Results 1-7 of 7 (Search time: 0.002 seconds).
| Issue Date | Title | Author(s) |
1 | 2022 | Artificial bee colony algorithm for solving multi-objective distributed fuzzy permutation flow shop problem | Baysal, Mehmet Emin ; Sarucan, Ahmet ; Büyüközkan, Kadir; Engin, Orhan |
2 | 2022 | Distributed No-Wait Flow Shop with Fuzzy Environment | Başar, Ramazan; Büyüközkan, K.; Engin, Orhan |
3 | 2022 | A fuzzy logic based methodology for multi-objective hybrid flow shop scheduling with multi-processor tasks problems and solving with an efficient genetic algorithm | Engin, Orhan ; Yılmaz, Mustafa Kerim |
4 | 2022 | Integrated Production and Transportation Scheduling Problem with Multiple Plants, Multiple Vehicles and Perishable Products | Can Atasagun, Gözde ; Karaoğlan, İsmail |
5 | 2019 | Integrated production scheduling and distribution planning with time windows | Kesen, Saadettin Erhan ; Bektaş, T. |
6 | 2021 | Multi-trip heterogeneous vehicle routing problem coordinated with production scheduling: Memetic algorithm and simulated annealing approaches | Yağmur, Ece; Kesen, Saadettin Erhan |
7 | 2018 | A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems | Engin, Orhan ; Güçlü, Abdullah |