Solution Approaches for the Integrated Production and Outbound Distribution Scheduling Problem With Multiple Plants and Perishable Items

relationships.isProjectOf

relationships.isJournalIssueOf

Abstract

In this manuscript, we consider the integrated production and outbound distribution system in which there are several geographically dispersed facilities. These facilities are responsible for producing and delivering time-sensitive customer demands. We propose a mixed integer programming (MIP) formulation, MIP with an initial solution using Clarke and Wright (MIPCW) and a metaheuristic algorithm (Variable Neighborhood Search-VNS) for the problem whose objective is to minimize the maximum delivery time whereby satisfying all customer demands. We conduct a two-stage experimental study to determine the effectiveness of the proposed metaheuristic algorithm. We compare the VNS algorithm with the best-known solutions for the single plant version of the problem, in the first stage. These results indicate that the VNS algorithm yields promising results. The second stage includes the results for the MIP formulation and the VNS algorithm on a set of newly generated test instances. The average percentage gap between the VNS algorithm and the MIPCW formulation is about 5% which means that the VNS algorithm gives better results in average about 70 s computation time. These results show how effective the suggested VNS algorithm is at solving the test instances. © 2023 Elsevier Ltd

Description

Keywords

Machine scheduling, Mixed integer programming formulation, Time-sensitive products, Variable neighborhood search algorithm, Vehicle routing problem, Electric power distribution, Routing algorithms, Vehicle routing, Customer demands, Integrated production, Machine scheduling, Meta-heuristics algorithms, Mixed integer programming: formulation, Neighborhood search algorithms, Time-sensitive product, Variable neighborhood search, Variable neighborhood search algorithm, Vehicle Routing Problems, Integer programming, Time -Sensitive Products, Scheduling (Production Processes), Metaheuristic, Computer Science, Mathematical Optimization

Fields of Science

0211 other engineering and technologies, 02 engineering and technology

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
1

Volume

237

Issue

Start Page

121318

End Page

121318
PlumX Metrics
Citations

Scopus : 9

Captures

Mendeley Readers : 14

SCOPUS™ Citations

6

checked on Aug 16, 2026

Web of Science™ Citations

3

checked on Aug 16, 2026

Page Views

3

checked on Aug 16, 2026

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.99