Distributed No-Wait Flow Shop With Fuzzy Environment

dc.contributor.author Başar, Ramazan
dc.contributor.author Büyüközkan, K.
dc.contributor.author Engin, Orhan
dc.date.accessioned 2022-10-08T20:48:59Z
dc.date.available 2022-10-08T20:48:59Z
dc.date.issued 2022
dc.description International Conference on Intelligent and Fuzzy Systems, INFUS 2022 -- 19 July 2022 through 21 July 2022 -- 280209 en_US
dc.description.abstract In the no-wait flow shop scheduling problem, n-job should be proceeded on m-machine with the same order and do not permit the jobs to wait during the scheduling periods. Also, at the distributed no-wait flow shop scheduling problem, there are multi-factory for processing n-job with m-machine for no-wait constraint. In this study, distributed no-wit flow shop scheduling with the fuzzy due date is considered. The due date of the jobs is defined with fuzzy numbers. A parallel kangaroo algorithm is proposed to solve the distributed no-wait flow shop scheduling problem with the fuzzy due date. The proposed algorithm is tested from the literature by the benchmark problems. The results show that the proposed parallel kangaroo algorithm is efficient for distributed no-wit flow shop scheduling problems with fuzzy due date problems. © 2022, The Author(s), under exclusive license to Springer Nature Switzerland AG. en_US
dc.identifier.doi 10.1007/978-3-031-09173-5_35
dc.identifier.isbn 9783031091728
dc.identifier.issn 2367-3370
dc.identifier.scopus 2-s2.0-85135021839
dc.identifier.uri https://doi.org/10.1007/978-3-031-09173-5_35
dc.identifier.uri https://hdl.handle.net/20.500.13091/2937
dc.language.iso en en_US
dc.publisher Springer Science and Business Media Deutschland GmbH en_US
dc.relation.ispartof Lecture Notes in Networks and Systems en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Distributed no-wait flow shop en_US
dc.subject Fuzzy due date en_US
dc.subject Parallel kangaroo algorithm en_US
dc.subject Scheduling en_US
dc.title Distributed No-Wait Flow Shop With Fuzzy Environment en_US
dc.type Conference Object en_US
dspace.entity.type Publication
gdc.author.institutional Engin, Orhan
gdc.author.scopusid 57261386100
gdc.author.scopusid 55902625100
gdc.author.scopusid 55948252100
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.access metadata only access
gdc.coar.type text::conference output
gdc.description.department Fakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümü en_US
gdc.description.endpage 286 en_US
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q4
gdc.description.startpage 279 en_US
gdc.description.volume 504 LNNS en_US
gdc.description.wosquality N/A
gdc.identifier.openalex W4285245365
gdc.identifier.wos WOS:000889380800035
gdc.index.type WoS
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 2.0
gdc.oaire.influence 2.563806E-9
gdc.oaire.isgreen false
gdc.oaire.keywords Fuzzy Due Date
gdc.oaire.keywords Parallel Kangaroo Algorithm
gdc.oaire.keywords Scheduling
gdc.oaire.keywords Distributed No-Wait Flow Shop
gdc.oaire.popularity 3.2986112E-9
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0202 electrical engineering, electronic engineering, information engineering
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 2.64726901
gdc.openalex.normalizedpercentile 0.89
gdc.openalex.toppercent TOP 10%
gdc.opencitations.count 1
gdc.plumx.crossrefcites 1
gdc.plumx.scopuscites 2
gdc.scopus.citedcount 2
gdc.virtual.author Engin, Orhan
gdc.wos.citedcount 3
relation.isAuthorOfPublication 40e3d4e9-243f-4b10-8413-a3db7bbf017c
relation.isAuthorOfPublication.latestForDiscovery 40e3d4e9-243f-4b10-8413-a3db7bbf017c

Files