Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/6039
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBaşar, Ramazan-
dc.contributor.authorEngin, Orhan-
dc.date.accessioned2024-08-10T13:37:25Z-
dc.date.available2024-08-10T13:37:25Z-
dc.date.issued2024-
dc.identifier.issn0305-215X-
dc.identifier.issn1029-0273-
dc.identifier.urihttps://doi.org/10.1080/0305215X.2024.2367600-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/6039-
dc.description.abstractThe literature published since the year 2000 was reviewed regarding the no-wait flow-shop scheduling (No-WFSS) problem. The No-WFSS problem with separate set-up times and fuzzy due dates is addressed to maximize the customer satisfaction index. A scatter search algorithm (SSA) is proposed, hybridized by some operators. The proposed SSA was first used for solving the considered fuzzy no-wait flow-shop scheduling with set-up time (FNo-WFSSWST) problem. Parameters were calibrated using 192 No-WFSS benchmark instances. The proposed SSA was compared with the genetic heuristic, adaptive learning approach, and hybrid ant colony optimization methods from the literature, showing significant performance improvements. It is concluded that the proposed algorithm is an efficient method for solving FNo-WFSSWST problems.en_US
dc.language.isoenen_US
dc.publisherTaylor & Francis Ltden_US
dc.relation.ispartofEngineering Optimizationen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectNo-waiten_US
dc.subjectfuzzyen_US
dc.subjectflow-shop schedulingen_US
dc.subjectscatter search algorithmen_US
dc.subjectcustomer satisfaction indexen_US
dc.subjectParticle Swarm Optimizationen_US
dc.subjectDependent Setup Timesen_US
dc.subjectTotal Completion-Timeen_US
dc.subjectEvolutionary Clustering Searchen_US
dc.subjectShop Problemen_US
dc.subjectMinimize Makespanen_US
dc.subjectTotal Flowtimeen_US
dc.subjectM-Machineen_US
dc.subjectDue-Dateen_US
dc.subjectAvailability Constraintsen_US
dc.titleA hybrid scatter search method for solving fuzzy no-wait flow-shop scheduling problemsen_US
dc.typeArticleen_US
dc.typeArticle; Early Accessen_US
dc.identifier.doi10.1080/0305215X.2024.2367600-
dc.identifier.scopus2-s2.0-85197898490en_US
dc.departmentKTÜNen_US
dc.authoridBasar, Ramazan/0000-0001-5416-4914-
dc.authorwosidBasar, Ramazan/KIE-5786-2024-
dc.identifier.wosWOS:001262164500001en_US
dc.institutionauthor-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.authorscopusid57261386100-
dc.authorscopusid55948252100-
item.fulltextNo Fulltext-
item.openairetypeArticle-
item.openairetypeArticle; Early Access-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.cerifentitytypePublications-
item.cerifentitytypePublications-
item.grantfulltextnone-
crisitem.author.dept02.09. Department of Industrial Engineering-
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collections
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections
Show simple item record



CORE Recommender

Page view(s)

4
checked on Aug 26, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.