Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/2635
Title: An Approach for Evaluating External Wall-Roof Coupling Detail’s Performance
Authors: Türkay, Işıl
Altun, M. Cem
Keywords: Detail
Evaluation
Exterior Wall
Roof
Performance
Publisher: Konya Technical University Faculty of Architecture and Design
Abstract: Designing a coupling detail is a complicated job since coupling details are areas where building elements and other sub-systems come together and performances of single building elements come into a complex interaction. Mistakes in the design stage can lead to building failures after construction, which on the other hand are causing unhealthy environments and high repair or retrofitting costs. The intersection areas in the external envelope, exposed to environmental conditions, are even more vulnerable to building failures. Building element systems of the external envelope do have several functions. Some of them are in common, but some functions are differing. These common and/or varying functions are coupled at the intersection area, working independently, cooperatively or opposing. This is why a complex interaction is born in a coupling detail. The coupling area of the exterior wall system with the roof system is one of those intersection areas of the external envelope. It is obvious that a way to avoid building failures is proper detailing. In this paper, an approach to evaluate external wall-roof coupling detail’s performance is presented. The evaluation approach consists of two modules. The first module is a “performance requirements checklist” separately generated for each building element, namely; the exterior wall systems and the roof systems. The second module is a step-by-step evaluation tool for coupling details. The tool and the checklists are prepared by taking into consideration of sole functional continuity at coupling details, supported by material continuity and geometric precautions. The evaluation tool can be used either in the detail design process or before the tendering process for finalized details. The usability of the proposed approach is demonstrated through its application on a real world problem and pros and cons of the approach are discussed in conclusion.
Description: 139
iconarch:S1
URI: https://iconarch.ktun.edu.tr/index.php/iconarch/article/view/139/113
https://iconarch.ktun.edu.tr/index.php/iconarch/article/view/139
https://hdl.handle.net/20.500.13091/2635
Appears in Collections:ICONARCH - International Congress of Architecture and Planning

Files in This Item:
File SizeFormat 
document - 2023-03-10T091523.943.pdf808.91 kBAdobe PDFView/Open
Show full item record



CORE Recommender

Page view(s)

62
checked on Apr 22, 2024

Download(s)

14
checked on Apr 22, 2024

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.