Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/1990
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAtasagun, Yakup-
dc.contributor.authorKara, Yakup-
dc.date.accessioned2022-02-26T20:54:20Z-
dc.date.available2022-02-26T20:54:20Z-
dc.date.issued2021-
dc.identifier.issn2667-8055-
dc.identifier.urihttps://doi.org/10.36306/konjes.816944-
dc.identifier.urihttps://dergipark.org.tr/tr/pub/konjes/issue/62624/816944-
dc.identifier.urihttps://dergipark.org.tr/tr/download/article-file/1365877-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/1990-
dc.descriptionDergiPark: 816944en_US
dc.descriptionkonjesen_US
dc.description.abstractBu çalışmada, Konya’da faaliyet gösteren ve güneş enerjisi kolektörü üreten bir firmanın montaj hatlarında kaynak bağımlı görev süreleri ile paralel montaj hattı dengeleme uygulaması yapılmıştır.Öncelikle ilgili firmanın montaj hattı tanıtılmış ve kaynak bağımlı görev süreleri ile hat dengeleme yaklaşımını kullanmanın son derece uygun olduğunu göstermek amacıyla montaj hattındaki görevlerin farklı kaynak alternatifleri ile farklı sürelerde tamamlanma seçenekleri ortaya koyulmuştur. Daha sonra, karar vericiler tarafından mevcut montaj hattı ile aynı özelliklere sahip ikinci bir montaj hattının kurulmasına karar verildiği ve yeni kurulacak hattın mevcut hatta paralel bir şekilde yerleştirilerek faaliyet göstereceğinden hareketle bahsi geçen bu iki montaj hattının paralel montaj hattı dengeleme yaklaşımı ile bütünleşik olarak dengelenmesi yapılmıştır. Uygulama sonucu, bahsi geçen firmanın montaj hatlarının, karar vericiler tarafından planlanan çevrim süresi değeri için kaynak bağımlı görev süreleriyle paralel hat dengeleme yaklaşımı kullanılarak bütünleşik olarak dengelenmesinin, hatların birbirinden bağımsız dengelenmesi durumuna kıyasla aylık toplam maliyette % 5,67 oranında bir iyileştirme sağladığı belirlenmiştir. Aynı hatların beş farklı çevrim süresi değeri için dengelenmesiyle yapılan senaryo analizinde de kaynak bağımlı görev süreleriyle paralel hat dengeleme yaklaşımının bağımsız dengeleme yaklaşımına göre toplam maliyeti iyileştirme oranları ortalaması % 8,09 olarak elde edilmiştir.en_US
dc.description.abstractIn this study, the approach of parallel assembly line balancing with resource dependent task times is applied in the assembly lines of a company operating in Konya and producing solar energy collectors. First of all, the assembly line of the relevant company was introduced and the alternatives of completing the tasks in the assembly line using different resources were presented in order to show that it is very convenient to use the approach of assembly line balancing with resource dependent task times.Later, considering that the decision makers decided to establish a second assembly line with the same features as the existing assembly line and the new line will operate by placing it parallel to the existing line, these two assembly lines are balanced using the parallel assembly line balancing approach. As a result of the application, it is determined that the integrated balance of the aforementioned assembly lines using the approach of parallel assembly line balancing with resource dependent task times, provides an improvement of 5.67% in monthly total cost compared to the case of balancing the lines independently, for the cycle time value which is planned by decision makers. In the scenario analysis performed by balancing the same lines for five different cycle time values, the average of the total cost improvement rates of the parallel line balancing approach compared to the independent balancing is obtained as 8.09%.en_US
dc.language.isotren_US
dc.publisherKonya Technical Universityen_US
dc.relation.ispartofKonya Mühendislik Bilimleri Dergisien_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectGerçek hayat uygulamasıen_US
dc.subjectKaynak bağımlı görev süreleriyle montaj hattı dengelemeen_US
dc.subjectParalel montaj hattı dengelemeen_US
dc.subjectTamsayılı programlamaen_US
dc.subjectReal life applicationen_US
dc.subjectassembly line balancing with resource dependent task timesen_US
dc.subjectparallel assembly line balancingen_US
dc.subjectinteger programmingen_US
dc.titleGÜNEŞ ENERJİSİ KOLEKTÖRÜ ÜRETİMİNDE KAYNAK BAĞIMLI GÖREV SÜRELERİ İLE PARALEL MONTAJ HATTI DENGELEMEen_US
dc.title.alternativeParallel Assembly Line Balancing with Resource Dependent Task Times in Manufacturing of Solar Energy Collectoren_US
dc.typeArticleen_US
dc.identifier.doi10.36306/konjes.816944-
dc.departmentFakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.identifier.volume9en_US
dc.identifier.issue2en_US
dc.identifier.startpage314en_US
dc.identifier.endpage326en_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.trdizinid491435en_US
item.fulltextWith Fulltext-
item.openairetypeArticle-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.languageiso639-1tr-
crisitem.author.dept02.09. Department of Industrial Engineering-
crisitem.author.dept02.09. Department of Industrial Engineering-
Appears in Collections:Konya Mühendislik Bilimleri Dergisi
Mühendislik ve Doğa Bilimleri Fakültesi Koleksiyonu
TR Dizin İndeksli Yayınlar Koleksiyonu / TR Dizin Indexed Publications Collections
Files in This Item:
File SizeFormat 
10.36306-konjes.816944-1365877.pdf818.79 kBAdobe PDFView/Open
Show simple item record



CORE Recommender

Page view(s)

76
checked on May 13, 2024

Download(s)

34
checked on May 13, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.