Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/171
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAtasagun, Y.-
dc.contributor.authorKara, Y.-
dc.contributor.authorCan Atasagun, Gözde-
dc.date.accessioned2021-12-13T10:19:54Z-
dc.date.available2021-12-13T10:19:54Z-
dc.date.issued2019-
dc.identifier.issn0884-8289-
dc.identifier.urihttps://doi.org/10.1007/978-3-319-97511-5_9-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/171-
dc.description.abstractThe concept of Shojinka, which is an important element of Just in Time production system, is attaining flexibility on the number of workers in a workshop due to demand variations. Even though Just in Time production system adopts U-shaped line layout, traditional straight lines can be combined and balanced in an integrated manner to obtain the advantages of Shojinka. In this case, the problem, which is called Integrated Balancing of Multiple Straight Lines, arises. On the other hand, the basic assumption of assembly line balancing is that every task’s time is fixed. However, in practice, different resource alternatives such as equipment or assistant worker may be available to process a task with different times. The problem in this case is to assign tasks and resources to stations that minimise total cost. In this study, a binary integer mathematical model is presented for integrated balancing of multiple straight lines, assuming that task times are resource dependent. The proposed model is illustrated and validated using several examples. An experimental analysis is also conducted to emphasize the advantages of the integrated balancing concept, compared to the situation in which the lines are balanced independent from each other. The experimental results show that, when multiple straight assembly lines are balanced in an integrated manner with resource dependent task times, an average total cost improvement of 23.105% can be obtained compared to the independent balances of the lines. This is a significant improvement that emphasizes the importance of balancing multiple straight lines in an integrated manner, to take the advantages of shojinka and to adhere to the main philosophy of Just in Time. © Springer Nature Switzerland AG 2019.en_US
dc.language.isoenen_US
dc.publisherSpringer New York LLCen_US
dc.relation.ispartofInternational Series in Operations Research and Management Scienceen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectLine Balancingen_US
dc.subjectMultiple straight linesen_US
dc.subjectResource dependent task timesen_US
dc.subjectShojinkaen_US
dc.titleAchieving shojinka by integrated balancing of multiple straight lines with resource dependent task timesen_US
dc.typeBook Parten_US
dc.identifier.doi10.1007/978-3-319-97511-5_9-
dc.identifier.scopus2-s2.0-85056629323en_US
dc.departmentFakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.identifier.volume273en_US
dc.identifier.startpage253en_US
dc.identifier.endpage273en_US
dc.relation.publicationcategoryKitap Bölümü - Uluslararasıen_US
dc.authorscopusid35317072500-
dc.authorscopusid15834728900-
dc.authorscopusid57204680005-
dc.identifier.scopusqualityQ1-
item.grantfulltextnone-
item.openairetypeBook Part-
item.fulltextNo Fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.cerifentitytypePublications-
crisitem.author.dept02.09. Department of Industrial Engineering-
crisitem.author.dept02.09. Department of Industrial Engineering-
Appears in Collections:Mühendislik ve Doğa Bilimleri Fakültesi Koleksiyonu
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collections
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

1
checked on May 4, 2024

Page view(s)

134
checked on Apr 29, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.