Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/844
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKeskin, Muhammed Emre-
dc.contributor.authorDöyen, Alper-
dc.contributor.authorAkyer, Hasan-
dc.contributor.authorGüler, Mehmet Güray-
dc.date.accessioned2021-12-13T10:32:04Z-
dc.date.available2021-12-13T10:32:04Z-
dc.date.issued2018-
dc.identifier.issn1751-5254-
dc.identifier.issn1751-5262-
dc.identifier.urihttps://doi.org/10.1504/EJIE.2018.096394-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/844-
dc.description.abstractExamination timetabling problem (ETP) is one of the hardest administrative tasks that has to be undertaken at each semester in all faculties. Although the major structure of the problem remains intact, requirements may change from faculty to faculty causing major changes in the solution procedures. The number of academic staff and the level of infrastructures of newly established universities cannot keep up with the increasing number of departments and students. This scarcity brings several additional constraints to the ETP. In this study, we propose a two stage solution procedure for the ETP of such universities. We apply our solution method to a real problem. We show that better feasible solutions can be found in shorter computation times compared to commercial softwares. Moreover we show that the total examination period length can be reduced from seven days to six days with the proposed method.en_US
dc.language.isoenen_US
dc.publisherINDERSCIENCE ENTERPRISES LTDen_US
dc.relation.ispartofEUROPEAN JOURNAL OF INDUSTRIAL ENGINEERINGen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectExamination Timetablingen_US
dc.subjectScarce Resourcesen_US
dc.subjectMixed-Integer Programmingen_US
dc.subjectOptimisationen_US
dc.subjectDecompositionen_US
dc.subjectTwo Stage Solution Strategyen_US
dc.subjectHeuristicen_US
dc.subjectIndustrial Engineeringen_US
dc.subjectColony Optimizationen_US
dc.subjectAlgorithmen_US
dc.titleExamination timetabling problem with scarce resources: a case studyen_US
dc.typeArticleen_US
dc.identifier.doi10.1504/EJIE.2018.096394-
dc.identifier.scopus2-s2.0-85057854372en_US
dc.departmentFakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.authoridGuler, Mehmet Guray/0000-0002-9987-7616-
dc.authorwosidGuler, Mehmet Guray/ABA-1593-2020-
dc.identifier.volume12en_US
dc.identifier.issue6en_US
dc.identifier.startpage855en_US
dc.identifier.endpage874en_US
dc.identifier.wosWOS:000451844600005en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.authorscopusid54789689000-
dc.authorscopusid22978787200-
dc.authorscopusid57076920500-
dc.authorscopusid56725851300-
dc.identifier.scopusqualityQ2-
item.cerifentitytypePublications-
item.grantfulltextnone-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypeArticle-
item.fulltextNo Fulltext-
crisitem.author.dept02.09. Department of Industrial Engineering-
Appears in Collections:Mühendislik ve Doğa Bilimleri Fakültesi Koleksiyonu
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collections
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

3
checked on Apr 13, 2024

WEB OF SCIENCETM
Citations

6
checked on Apr 13, 2024

Page view(s)

76
checked on Apr 15, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.