Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/3687
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKökçam, Abdullah Hulusi-
dc.contributor.authorEngin, Orhan-
dc.date.accessioned2023-03-03T13:32:26Z-
dc.date.available2023-03-03T13:32:26Z-
dc.date.issued2022-
dc.identifier.issn1542-3980-
dc.identifier.issn1542-3999-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/3687-
dc.description.abstractDetermining the resource requirements and the duration of activities are crucial points in project scheduling. Completing a project on planned time heavily depends on the activity durations and resources, which should be determined as accurately and precisely as possible. A Hybrid parallel kangaroo algorithm (HPKA) is developed to cope with this problem and prepare more realistic project schedules that could be executed in time with the minimum risk of being late. The objective is to find a schedule that minimizes schedule risk and maximizes the minimum satisfaction degrees of all activities. The proposed hybrid algorithm is tested with the benchmark problems from the literature. The proposed HPKA is then used to solve a disc mower manufacturing project scheduling problem of a real-world company that manufactures agricultural machinery. The results indicate that the proposed hybrid algorithm can achieve good results for these problems.en_US
dc.language.isoenen_US
dc.publisherOld City Publishing Incen_US
dc.relation.ispartofJournal of Multiple-Valued Logic and Soft Computingen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectResource-constrained project schedulingen_US
dc.subjectdisc mower manufacturing projecten_US
dc.subjectfuzzy numbersen_US
dc.subjecthybrid parallel kangaroo algorithmen_US
dc.subjectproject delay risken_US
dc.subjectminimum satisfaction valuesen_US
dc.subjectImplementationen_US
dc.subjectTimeen_US
dc.titleA Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Projecten_US
dc.typeArticleen_US
dc.departmentKTÜNen_US
dc.authoridEngin, Orhan/0000-0002-7250-0317-
dc.authorwosidEngin, Orhan/AAG-6283-2019-
dc.identifier.volume39en_US
dc.identifier.issue5-6en_US
dc.identifier.startpage561en_US
dc.identifier.endpage590en_US
dc.identifier.wosWOS:000899309000008en_US
dc.institutionauthor-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanen_US
dc.identifier.scopusqualityQ3-
item.cerifentitytypePublications-
item.grantfulltextnone-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypeArticle-
item.fulltextNo Fulltext-
crisitem.author.dept02.09. Department of Industrial Engineering-
Appears in Collections:WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections
Show simple item record



CORE Recommender

Page view(s)

90
checked on Apr 15, 2024

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.