Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.13091/2937
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Başar, Ramazan | - |
dc.contributor.author | Büyüközkan, K. | - |
dc.contributor.author | Engin, Orhan | - |
dc.date.accessioned | 2022-10-08T20:48:59Z | - |
dc.date.available | 2022-10-08T20:48:59Z | - |
dc.date.issued | 2022 | - |
dc.identifier.isbn | 9783031091728 | - |
dc.identifier.issn | 2367-3370 | - |
dc.identifier.uri | https://doi.org/10.1007/978-3-031-09173-5_35 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.13091/2937 | - |
dc.description | International Conference on Intelligent and Fuzzy Systems, INFUS 2022 -- 19 July 2022 through 21 July 2022 -- 280209 | en_US |
dc.description.abstract | In the no-wait flow shop scheduling problem, n-job should be proceeded on m-machine with the same order and do not permit the jobs to wait during the scheduling periods. Also, at the distributed no-wait flow shop scheduling problem, there are multi-factory for processing n-job with m-machine for no-wait constraint. In this study, distributed no-wit flow shop scheduling with the fuzzy due date is considered. The due date of the jobs is defined with fuzzy numbers. A parallel kangaroo algorithm is proposed to solve the distributed no-wait flow shop scheduling problem with the fuzzy due date. The proposed algorithm is tested from the literature by the benchmark problems. The results show that the proposed parallel kangaroo algorithm is efficient for distributed no-wit flow shop scheduling problems with fuzzy due date problems. © 2022, The Author(s), under exclusive license to Springer Nature Switzerland AG. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Springer Science and Business Media Deutschland GmbH | en_US |
dc.relation.ispartof | Lecture Notes in Networks and Systems | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Distributed no-wait flow shop | en_US |
dc.subject | Fuzzy due date | en_US |
dc.subject | Parallel kangaroo algorithm | en_US |
dc.subject | Scheduling | en_US |
dc.title | Distributed No-Wait Flow Shop with Fuzzy Environment | en_US |
dc.type | Conference Object | en_US |
dc.identifier.doi | 10.1007/978-3-031-09173-5_35 | - |
dc.identifier.scopus | 2-s2.0-85135021839 | en_US |
dc.department | Fakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümü | en_US |
dc.identifier.volume | 504 LNNS | en_US |
dc.identifier.startpage | 279 | en_US |
dc.identifier.endpage | 286 | en_US |
dc.identifier.wos | WOS:000889380800035 | en_US |
dc.institutionauthor | Engin, Orhan | - |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.authorscopusid | 57261386100 | - |
dc.authorscopusid | 55902625100 | - |
dc.authorscopusid | 55948252100 | - |
dc.identifier.scopusquality | Q4 | - |
item.cerifentitytype | Publications | - |
item.grantfulltext | none | - |
item.languageiso639-1 | en | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.openairetype | Conference Object | - |
item.fulltext | No Fulltext | - |
crisitem.author.dept | 02.09. Department of Industrial Engineering | - |
Appears in Collections: | Mühendislik ve Doğa Bilimleri Fakültesi Koleksiyonu Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collections WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections |
CORE Recommender
WEB OF SCIENCETM
Citations
1
checked on Apr 13, 2024
Page view(s)
58
checked on Apr 15, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.