Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.13091/272
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBilim, Niyazi-
dc.contributor.authorÇelik, Arif-
dc.contributor.authorKekeç, Bilgehan-
dc.date.accessioned2021-12-13T10:23:57Z-
dc.date.available2021-12-13T10:23:57Z-
dc.date.issued2020-
dc.identifier.issn1866-7511-
dc.identifier.issn1866-7538-
dc.identifier.urihttps://doi.org/10.1007/s12517-020-06181-1-
dc.identifier.urihttps://hdl.handle.net/20.500.13091/272-
dc.description.abstractCrushed stone is the most important raw material for concrete and asphalt production. As a high-volume low-unit-value industry, the crushed stone production sector is highly competitive which implies the necessity to optimise the costs of all of its production operations, i.e. drilling and blasting, secondary breaking, loading, hauling and crushing. In this context, this paper investigates the effect of bench blasting design parameters on the unit-costs and total production cost of aggregate production. For this purpose, 40 blasts were conducted and investigated. The studied parameters included different blasthole length (12 m, 15 m, 18 m, 21.5 m and 25 m) and diameter (89 mm and 102 mm), in addition to different spacing, burden and stemming length. As a result, it was found that an increase in blasthole length led to an increase in the unit cost of drilling operation. In addition, it was found that a blasthole length of 15 m ensured optimum fragmentation, diminishing the costs of subsequent operations. Incrementing the blasthole diameter from 89 to 102 mm reduced the total unit cost by 0.091 $/m(3). Incrementing the burden and spacing by 0.25 m also decreased the total unit cost by 0.097 $/m(3). However, accreting the stemming length by 0.5 m induced a slight decrease in the total unit cost by 0.026 $/m(3).en_US
dc.language.isoenen_US
dc.publisherSPRINGER HEIDELBERGen_US
dc.relation.ispartofARABIAN JOURNAL OF GEOSCIENCESen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectAggregateen_US
dc.subjectCrushed stoneen_US
dc.subjectQuarrying operationsen_US
dc.subjectProductionen_US
dc.subjectUnit costen_US
dc.subjectCost parametersen_US
dc.subjectIMPACTen_US
dc.titleAssessment of the effect of blasthole design parameters on total cost in quarriesen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s12517-020-06181-1-
dc.identifier.scopus2-s2.0-85095117936en_US
dc.departmentFakülteler, Mühendislik ve Doğa Bilimleri Fakültesi, Maden Mühendisliği Bölümüen_US
dc.authorwosidBilim, Niyazi/ABI-4815-2020-
dc.authorwosidKekec, Bilgehan/ABA-6334-2021-
dc.identifier.volume13en_US
dc.identifier.issue21en_US
dc.identifier.wosWOS:000590618500003en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.authorscopusid24167680000-
dc.authorscopusid57195261155-
dc.authorscopusid15053492600-
dc.identifier.scopusqualityQ2-
item.cerifentitytypePublications-
item.grantfulltextembargo_20300101-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypeArticle-
item.fulltextWith Fulltext-
crisitem.author.dept02.12. Department of Mining Engineering-
crisitem.author.dept02.12. Department of Mining Engineering-
Appears in Collections:Mühendislik ve Doğa Bilimleri Fakültesi Koleksiyonu
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collections
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections
Files in This Item:
File SizeFormat 
s12517-020-06181-1.pdf
  Until 2030-01-01
5.31 MBAdobe PDFView/Open    Request a copy
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

2
checked on Apr 13, 2024

WEB OF SCIENCETM
Citations

2
checked on Apr 13, 2024

Page view(s)

120
checked on Apr 15, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.